April to June: the main window
Mild days, longer light and lower humidity make late spring the most reliable period for facade work. Book surveys in February to secure the slot.
July to September: watch the heat
Direct sun dries paint too fast and leaves lap marks. We follow the shade around the building and start on the west side in the afternoon.
October to March: repair season
Timber repair, glazing and interior work move inside. Exterior painting waits for a run of dry days above five degrees.
- Check gutters before winter
- Treat timber end grain
- Keep interior rooms moving
Written by Jonas Bech
Part of the Sorø painting team. We answer colour, preparation and scheduling questions every day on site.